PROJECTS .

Uribarri Tunnel

  • 164
  • 164
  • 164
  • 164
  • 164
  • 164
CLIENT:
YEAR:
2012
Uribarri Tunnel .

Equipment made up by 1 formwork and 1 formwork carrying cart, R1 = 4.16 m, R2 = 8.40 m, 7.5 m progression.

Construction project of the tunnel of line 3 of the metropolitan railway from Bilbao (Bizkaia) Uribarri section, 950 m long.
Client: UTE Metro Uribarri (Ferrovial, Amenabar, Exbasa