Legutiano 2 Tunnel

  • 168
  • 168
  • 168
  • 168
  • 168
CLIENT:
YEAR:
2012 to 2013
Legutiano 2 Tunnel .

Equipment made up by 2 formwork and 2 formwork-carrying carts, R1 = 4.58 m and R2 = 7.75 m, progression 15 m.

Albertia tunnel construction project, for the Bilbo-Donostia high speed line. Section Eskoriatza-Legutiano (Araba), Subsection II. Two 2100 m long tubes.
Client: Hergón Metropolitan